Small HPP on Paghdjur River (2014)

Paghjur River


Risk Level: 1

Parameter Data Level
Sruface discharge volume in river section %, water 11.6129 1


 
Disastrous Condition
 
Critical Condition
 
Normal Condition

One SHPP Constructed on Paghjur

EcoLur
As of 1 January 2014, under the licenses issued by Public Services Regulatory Committee and the main indicators of small hydro power plants operated by hydropower companies, “Khachaghbyur HPP-1” SHPP is constructed on this river, which is operated by “Qarevard” LLC, derivation length - 2*1800 meters.

The SHPP pipes a total river area of 3600 meters, which makes up 11.6129% of the river.

Under EcoLur’s Ecological Risk Model, this indicator is within the standards.

Small HPP Khachaghbyur-2: Complete Documental Mess

Getahovit Villagers Accuse Nature Protection Ministry on Violating Environmental Legislation In Regard With “Khachaghbyur-2” Small HPP

Risk Analysis


Hot Spots


Regions


Subscription

Subscribe to receive our latest news